This is default featured slide 1 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 2 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 3 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 4 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 5 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

Sunday, 23 February 2025

What is responsibilities a Line Qc,When Layout Running

 

Some essential instructions for a line Quality Controller,when layout running.

@@Duplicate Counter Sample styling Confirm with approved GSS/Red tag Sample

@@Trims Card s/b need GPQ approval Sign

@@Update File/Tech Pack/BOM/Measurements Chart etc s/b need GPQ approval Sign

@@Issue Confirmed(Fabric-10% and Accessories 110%)

@@Process wise Styling Confirm

1.Thread Tex Needle and Thread Tex Bobin Thread count code Confirm

2.Thread Color code Confirm

3.S.P.I Confirm Top stc,seam join,Bartack,Eyelet hole etc. as per Buyer Required 

4.Processes Confirm with appropriate methods and Line QC must be know that Methods

5.Process Confirm within 5pcs garments

6.Line Feeding Report update with Operator, Technician Sign

7.TLS Board update process wise

8.Critical process Mock-Up confirm process wise

9.Label layout Confirm and Need GPQ approval 

10.Thread Trimming processes Identified and confirm thread cut process wise

11.Process Inline Report Confirm process wise

12.Button,Bartack,Eyelet,Eyelet hole,Button Hole Confirmed with Mock-Up.S/b Need GPQ approval if need

13.Zipper,Drawcord,Down,Elastic etc Measurement s/b attach at work/machine area.

14.Label(Care label,Size label,Main label attach operator s/b need training)

15.Label attach Mock-up Confirm with GPQ Sign

16.Print,Heat Seal,Embroidery,Elastic Height measurement Size garding Mock-Up confirm at Machine/Work area.

17.Check Instraction to Quality Inspector 

18.Pull Test and Pin Set-up Confirm

19.Bartack Density Confirm

20.Check Standard at QI Table

21.Process wise measurements adjust and Confirm

22.Quality Instruction On QI table..

#3P Report

#Critical To Quality/CTQ

#Measurement Sheet with highlighted Point 

#Label Layout

#Measurement Pattern 

#Checking Instruction 

#How to Measure

#Additional Measurement Sheet

#Job Responsibility 

#Quality Goal and Policy 

#Clock wise check Instruction


Saturday, 22 February 2025

Before Line Feeding s/b Arrange.

 

Before line feeding sewing line must be arrange bellow documents and gather proper knowledge..


1.Approved Sample

2.Approved Trims Card

3.PP Sample/GSS Comments

4.Updated Technical Sheet

5.BOM Sheet

6.PO Sheet

7.Approved Measurements Sheet

8.Additional Measurement Sheet

9.PP Meeting Comments

10.Print,Heat Seal,Embroidery Approval Sheet

11.Special Mail approval if needed

12.Approved Mock-up if needed

13.Size Set Report(Quality Inspection+Measurement sheet+Correction Sheet)

14.Button,Seam Sealing,Eyelet,Heat Seal Data Sheet

15.Booking Sheet

16.Zipper Measurement

17.Down Measurement 

18.Operation Bulletine/Layout Paper

19.Skinkge Report

20.Size Set Before wash Measurement Sheet

21.Critical to Quality/CTQ

22.Mock-Up Accessories 

23.Mock-Up Fabric

24.Mock-Up Board

25.Risk Analysis

26.3P Report

27.Q.I Check Instruction 



Friday, 21 February 2025


 How To Quality Check a Garment